Service
|
|
Quality guarantees to
promise
|
| 1、The shelve rigidity and intensity of our company accord with
sector standard JB/T5323-91 " welding type technological
condition of steel construction shelve of three-dimensional
warehouse " of national mechanical department With the
auspicious incorporated business standard " sectional steel
shelve " Q320104MRJ-1998 of wheat;
|
| 2、When fully loaded with, the deflection of roof beam of
bearing is not greater than L/250mm;
|
| 3、The steel that the main structure of the shelve uses is the
products of Shanghai Baoshan Iron and Steel Group ;
|
| 4、Shelve material by our
factory cold curved rolling mill, automatic puncher, roll over
such professional equipment as curved plane ,etc. make with
type, and is examined by the corresponding checkout equipment
instrument;
|
| 5、Base ,etc. weld the place and go on according to the
national standard , guarantee the welding seam is even , firm
and taking off and weld , welds the phenomenon emptily;
|
6、The surface pretreatment and spraying of the shelve and
fittings are finished on the advanced automatic spraying
assembly line , its procedure is:Rust removal Degrease Stoving Static
spraying Stoving The
Inspection of Packing is put in storage, coating quality accords
with GB9628 standard regulation.
|
| |
The project management promising
|
Project procedure: |
| 1、According to the project procedure, each procedure is
managed by special messengered.
|
| 2、The design department
designs the shelve according to the tender , assign the
production task form.
|
| 3、The production division receives the production task form,
according to making only, examine at the same time.
|
| 4、Department checks at random quality testing in process of
production, and inspect by random samples after production.
|
| 5、Pack putting in storage after the shelve is produced and
finished, then transported to the scene.
|
| 6、The placing point is divided the work by the installation
director , install according to the drawing that the design
department provides.
|
| 7、Must have quality testing department is it check to go on
when the installation , answer all is it check to go onning
careful after finishing.
|
The precautions:
|
| 1、Carry out the rules and regulations of our company
conscientiously, reach required production , installation
quality.
|
| 2、The special messenger is responsible for , each department
head is responsible for project director , the project director
is responsible for customer.
|
| |
Commitment in warranty period
|
| 1、Warranty period, shelve of system for equipment one year
after confirming qualified. Within warranty period, the shelve
system presents any quality problem, we will offer the free
service;
|
| 2、Guarantee to cooperate with owners to carry on regular
inspection and maintenance to the equipment within quality
duration of insurance. Before the quality is protected and
expired, we will carry on an overall inspection and maintenance
to the equipment.
|
| 3、If equipment breaks down, the bidder promises to make the
scheme of maintaining in receiving 12 hours after information,
send technology and maintenance personal to reach and solve the
problem live in 24 hours. If belong to the quality problem and
change the spare part damaged free.
|
| |
Commitment outside warranty
period
|
| The service after one year is a service outside warranty period
after it is qualified that the system is confirmed, whether our
company have responsibility offer lifetime service for
equipment, service this is for favourable paid service:Guarantee to offer spare part supply , quality inspection and
maintenance service of the package of all equipment to the owner
at favourable price in the work in future.
|
 |
|